Welcome to the Systems and Network Management Collaboration Project
Management of IEDs and networks is mission-critical for the successful operation of electric utilities. This projects supports collaboration on the IEC 61850 Systems and Network Management Project sponsored by AEP and EPRI.
The Electric Utility Substation is arguably the most critical link in the real time operations of the utility.
Data from the field is brought back in real time to monitor the power system and commands are sent to reliably and cost-effectively control the transmission, generation and distribution subsystems.
Modern substation automation systems utilizing LAN technology must be independent of any possible failures of the power systems, as they are essential in recovery operations.
Therefore the system design for the backup of the substation LAN hardware, software, communications and management functions is essential. Further, Systems and Network Management tools are essential as they assist in monitoring and maintaining the substation LAN functions, the connected intelligent devices, and provide a means of rapid recovery.
Important Dates
- January 23, 2025: Lorem ipsum dolor
- January 23, 2025: Lorem ipsum dolor
- January 23, 2025: Lorem ipsum dolor
- January 23, 2025: Lorem ipsum dolor
We invite all interested parties to review and comment on documents. Soon we will post a Survey to collect and manage input from reviewers.
Member-Only Documents
UCAIUG members can view documents lorem ipsum dolor sit amet consecutir adipiscing elit.
Redmine Project Management
61850ug uses Redmine for tickets, tasks, project wiki, and more.
Microsoft Teams Channel
We discuss and review documents, lorem ipsum dolor sit amet adipiscing elit consecutir.